In this video, I show you how I built a 30-metre long and 2-metre high gabion wall for slope stabilization. The summary includes the preparation of the foundation, the installation and filling of the stone baskets and the final construction of a raised bed above the retaining wall.
A slope in my garden had to be secured over a length of almost 30 meters. To do this, I used gabions - filled stone baskets that I have already installed in different variations on my property. In this project, an existing gabion wall was to be extended in order to support an approx. 2 meter high earth slope. A staircase was also installed in the middle.
Water pipes, empty conduits, waste water pipes and a filter fleece to prevent contamination were also laid. Finally, the stone baskets were filled with stones by hand.
The project began in the fall of 2019 and the last stones were filled in the summer of 2020. In this video I have summarized all construction stages from planning to the finished raised bed.
This video was originally created in German for my main YouTube channel @commaik đ https://youtube.com/commaik. It has been translated into English using đ¤ the AI tool HeyGen, which replicates my voice and synchronizes my lip movements.
Please note that â due to dynamic adjustments, the synchronization may not always be perfect.
đē The original video, which includes English subtitles, can be found here: https://youtu.be/xji2dzUE5fg
Product links:*
đ Small 20cm decorative gabion - https://amzn.to/3qUbV5R
đ 30cm gabion at the parking lot - https://amzn.to/3YUUL9M
đ 50cm gabion - https://amzn.to/3jpltla
đ 100cm gabions - https://amzn.to/2QzxvKK
đ Drainage fleece - https://amzn.to/2OIjOaq
đ PE water pipe - https://amzn.to/3LQSgf5
đ Empty electrical conduit - https://amzn.to/3ujY5yu
đ Bolt cutters - https://amzn.to/3GszHwa
đ Zinc spray - https://amzn.to/3KrI7V6
Chapter overview:
0:00 Introduction
1:10 Preparing the foundation
2:30 Setting up and securing stone baskets
4:00 Filling the stones by hand
6:00 Installing the steps in the gabion wall
7:30 Laying water pipes and empty conduits
9:00 Installing the filter fleece
11:00 Conclusion: Creating a raised bed
You can find more videos about this project in my playlist:
đ https://www.youtube.com/playlist?list=PLPz3dSjkl_un1spA31oW63h_4e5CaM25O
Do you like the video?
đ Then give it a thumbs up and subscribe to my channel! đ
#commaikEnglish #Gabionwall #slopestabilization
Support my channel:
â Donate coffee: https://buymeacoffee.com/commaik
đ° Paypal donation: https://paypal.com/donate/?hosted_button_id=7Y45TJENTZ67C
đ Amazon partner link: https://www.amazon.com/?tag=wwwcommaikdeu-20
Homepage & Social Media:
đ Homepage: https://commaik.de
đ Facebook: https://www.facebook.com/maik.florian.5
đ Pinterest: https://www.pinterest.de/commaik
đ Amazon: https://www.amazon.com/?tag=wwwcommaikdeu-20
đē YouTube: https://www.youtube.com/commaik?sub_confirmation=1
âšī¸ Imprint: https://commaik.de/impressum
đĩ Music: https://www.epidemicsound.com/referral/t8jqhp/
đĨ Tubebuddy: https://www.Tubebuddy.com/commaik
Follow me on my social media channels for more content! @commaik
This video was originally created in German for the channel https://youtube.com/commaik and then translated into English.
Note: All links marked with * are affiliate links. If you make a purchase through these links, I will receive a small commission at no additional cost to you. Thank you for your support!
Watch On YouTube